. . . a 150' Boom Lift was called in. Before the window frame could be removed to inspect/replace surrounding flashing, its four 74 lb. IGUs and then four 27 lb. stained glass panels had to be levitated down to the ground. Once the flashing was replaced, the process was reversed. NOW THE WINDOWS FOR CHRIST CHURCH REALLY WERE FINISHED!